Open Accessibility Menu
Hide

Ram Jack Systems in Action

Watch the videos below to learn more about how our system works.

Driven Piling Action

This video demonstrates how Ram Jack’s twin hydraulic cylinders drive steel piling through a guide sleeve and bracket using the weight of your home as a reaction force. The twin cylinders and drive head allow for longer sections of piling to be used, minimizing connections.

Piling Lift System

Ram Jack’s steel piling lift system utilizes an allthread and strap system to precisely hold the pile firmly in place without the use of shims or bolts. The strap has a capacity of up to 70 kips (70,000 lbs).

Helical Installation and Folding Slab Bracket Lift

Our interior folding slab bracket minimizes the size of the hole that is drilled in the slab on the interior of your home. Once the bracket is installed and pressure is applied, the bracket unfolds and evenly distributes force along the bottom side of the concrete slab.

Don't do it twice. Do it right. Make an appointment with Ram Jack Ohio to learn about specific services we offer or start by calling (888) 560-7949.