  • Midlothian Case Study - Tilt Wall Panel Underpinning & Lifting

    A 686,000 ft 2 office/warehouse was under construction for Sunrider International in Midlothian, TX. The building consisted of 9 ¼” thick tilt wall panels and steel columns supported on 24” diameter under reamed concrete piers. Soon after the panels ...

    Read More
  • Memphis Pyramid: Bass Pro Shop

    Situation : The Memphis Pyramid, future home of Bass Pro Shops, needed to undergo redevelopment and demolition. The footings under (supporting) the precast concrete (10 ft. wide x 44 ft. tall) panels at the base of the pyramid had settled up to 6 ...

    Read More
  • Helical Piles in Mezz Level

    For the Folgers Coffee Company nestled in New Orleans, Louisiana, a new mezzanine level in an existing building required a bit more research and engineering in order to be ready for new additions to it. When it was time to craft a solution prior to ...

    Read More