Limestone County Courthouse
Introduction: The Limestone County Courthouse is a beautiful, historic building that
not only represents justice and peace, but also the heart of the South
in Athens, Alabama. With a beautiful stairway leading to a decadent entry
surrounded by ornate columns and a clock for all to see, it looks more
like a museum than a public office.
The Problem: While the 1919 construction had a gorgeous exterior, the interior was in
need of updates, which included removing interior walls and enlarging
interior rooms. In order to provide adequate support to the structure
after the remodel, increased foundational support was required.
Proposed Solution: Alabama Ram Jack proposed the installation of a system of helical piles
to support the new footings inside the building. A subsurface investigation
was not necessary, and it was assumed that the underlying ground was stiff.
The project specifications assumed that the helical piles would be only
6 ft. long and that Ram Jack’s industry-leading 2 7/8 in. helical
piles would suffice. In addition, the plans specified that constant third-party
inspections would take place during the entire process of installation.
Outcome: After demolition, Alabama Ram Jack faced a number of obstacles with the
courthouse, including excessively deep and wide existing footings as well
as an extensive system of interior shoring that limited the available
space for helical pile installation. Additionally, Alabama Ram Jack could
not use mechanical equipment inside the historic structure; therefore,
all piles were installed using handheld drivers. After the first pile
reached bedrock at a depth of 31 ft. without generating significant torque,
it was clear that the soil was not as stiff as originally anticipated.
Alabama Ram Jack quickly dealt with each of the obstacles to complete
the job effectively and efficiently. First, Ram Jack supplied custom,
heavy-duty, fold out brackets in areas of need to provide added support
to the structure. Next, Ram Jack used a triple 8”/12”/14”
helix configuration strategically spaced to ensure the building was supported
prior to the piles reaching bedrock. Ram Jack Manufacturing supplied custom
brackets along with the large helical assemblies, and Alabama Ram Jack
installed sixty-one (61) piles to an average depth of 24 ft. in just 14
working days. The remodel was completed successfully, and the historic
building’s structural integrity was restored.