Open Accessibility Menu
Hide

Case Studies We Set Industry Standards

  • Search
  • Permanent Foundation Repair for Westmount at Houston Street

    The property managers at Westmount at Houston Street knew they needed a permanent resolution to the issues in the building that houses their clubhouse and main offices.

    Read More
  • Rosemont Bridge

    The Rosemont Bridge is a Pedestrian Expansion Bridge over Buffalo Bayou located near downtown Houston. One of the main supports of the bridge was showing damage from the strong water flow of Buffalo Bayou from Tropical Storm Harvey in 2018.

    Read More
  • Sunset Wall

    Stiver Engineering along with Benchmark Engineering contacted Ram Jack to assist in the design of the new retaining wall.

    Read More
  • Hayward Field

    Ram Jack helps install a hammer throw cage at the World Athletics Championships 2022

    Read More
  • Midlothian Case Study - Tilt Wall Panel Underpinning & Lifting

    A 686,000 ft 2 office/warehouse was under construction for Sunrider International in Midlothian, TX. The building consisted of 9 ¼” thick tilt wall panels and steel columns supported on 24” diameter under reamed concrete piers. Soon after the panels ...

    Read More
  • Ram Jack Repairs Condominiums In Bellevue, WA

    When residents at the Innisglen Condominiums started to notice cracks in the sheetrock, along with a list of other issues, the homeowner’s association knew something had to be done.

    Read More
  • Backyard Deck Saved from Sinking Foundation

    Residential Deck Saved with Helical Piles

    Read More
  • RAM JACK REPAIRS HISTORIC HOME IN LOS ANGELES

    LOS ANGELES, CA Repairing historic structures adds new layers of complexity to any project; providing foundation support to these spaces is no different. When a project in the 1950s originated with Arts and Architect Magazine and master architect ...

    Read More
Page 1 of 22