Case Studies We Set Industry Standards

  • Search
  • Permanent Foundation Repair for Westmount at Houston Street

    The property managers at Westmount at Houston Street knew they needed a permanent resolution to the issues in the building that houses their clubhouse and main offices.

    Read More
  • Assisted Living Facility Threatened By Foundation Settlement

    The Bonaventure Assisted Living Facility in Pueblo, Colorado contacted Straight Line Construction to provide a solution for an existing column. Floor level surveys and visual observations pointed to the culprit: settlement of the surficial soils.

    Read More
  • Helical Piles Installed in Confined Space

    Plans for Houston Country Club's main building--a two-story structure that contains the dining room, restrooms, kitchen, locker rooms and meeting room--renovation and roof replacement hit a snag, but with the help of Fortified Engineering and Ram Jack...

    Read More
  • Ram Jack Supports Boardwalk with Helical Piles

    COMMUNITY SAFETY: ONE BOARDWALK PILE AT A TIME Marstons Mills, MA When poor soil threatened community activities and safety, Ram Jack knew what to do. Twenty-eight Ram Jack piles secured a boardwalk in a timely manner for the Barnstable, ...

    Read More
  • Ram Jack Works With MDOT to Support Bridge

    Pearlington, Mississippi The supporting piles of a bridge in Pearlington, Mississippi were decaying, spelling disaster if the MDOT had not called in the experts at Ram Jack Southern Mississippi quickly. PROBLEM During a routine inspection of ...

    Read More
  • Chula Vista Apartments Saved From Dangerous Settlement

    Chula Vista Apartments Saved From Dangerous Settlement Chula Vista, California Ram Jack Pacific was called to Villa Granada Apartments in Chula Vista, California. This spacious, double-story, garden apartment complex comprises twelve (12) two-story ...

    Read More
  • Buckman Chemical Lab - New Construction

    Specializing in manufacturing chemicals for water treatment, pulp, paper, and leather industries, the Buckman Chemical Lab in Memphis, Tennessee ran into an unforeseen problem when attempting to install two new chemical tanks. The 3500 and 6500 ...

    Read More
  • Brandywine Industrial Warehouse Settlement Rectified Using Driven Piles

    Warehouse in Chula Vista Rectified Using Ram Jack Driven Piles Chula Vista Ram Jack Pacific was called to a 28 ft. tall concrete property. This industrial warehouse building forms part of a larger commercial development. Judging from an “as-graded” ...

    Read More