The property managers at Westmount at Houston Street knew they needed a permanent resolution to the issues in the building that houses their clubhouse and main offices.
The Bonaventure Assisted Living Facility in Pueblo, Colorado contacted Straight Line Construction to provide a solution for an existing column. Floor level surveys and visual observations pointed to the culprit: settlement of the surficial soils.
Plans for Houston Country Club's main building--a two-story structure that contains the dining room, restrooms, kitchen, locker rooms and meeting room--renovation and roof replacement hit a snag, but with the help of Fortified Engineering and Ram Jack...
COMMUNITY SAFETY: ONE BOARDWALK PILE AT A TIME Marstons Mills, MA When poor soil threatened community activities and safety, Ram Jack knew what to do. Twenty-eight Ram Jack piles secured a boardwalk in a timely manner for the Barnstable, ...
Pearlington, Mississippi The supporting piles of a bridge in Pearlington, Mississippi were decaying, spelling disaster if the MDOT had not called in the experts at Ram Jack Southern Mississippi quickly. PROBLEM During a routine inspection of ...
Chula Vista Apartments Saved From Dangerous Settlement Chula Vista, California Ram Jack Pacific was called to Villa Granada Apartments in Chula Vista, California. This spacious, double-story, garden apartment complex comprises twelve (12) two-story ...
Specializing in manufacturing chemicals for water treatment, pulp, paper, and leather industries, the Buckman Chemical Lab in Memphis, Tennessee ran into an unforeseen problem when attempting to install two new chemical tanks. The 3500 and 6500 ...
Warehouse in Chula Vista Rectified Using Ram Jack Driven Piles Chula Vista Ram Jack Pacific was called to a 28 ft. tall concrete property. This industrial warehouse building forms part of a larger commercial development. Judging from an “as-graded” ...